A decade of study and environmental review is documented here. Access feasibility studies, environmental impact statements, mitigation plans, specialist reports, and regulatory filings related to the Stibnite Gold Project.
Perpetua Resources has been studying the Stibnite Mining District for more than a decade. In 2014, we published our Pre-Feasibility Study (PFS) to the U.S. Forest Service. This document was foundational in helping our team develop our Plan of Restoration and Operations (PRO), which we submitted to regulators in 2016. Once we submitted the PRO we continued to study the site and found ways to improve our project. The public was able to review our refinements when the Draft Environmental Impact Statement (DEIS) was published in 2020, they were included as Alternative 2 in the document.
Nearly 10,000 people commented on the DEIS. Our team reviewed all of the public feedback and used it to identify further improvements to our plans. Near the start of 2021, we revised our preferred alternative, and submitted our Supplemental Draft Environmental Impact Statement (SDEIS) to the U.S. Forest Service in 2022. In 2024, the agency published the Stibnite Gold Project’s Final Environmental Impact Statement (FEIS) and Draft Record of Decision (Draft ROD). In January 2025, it published the project’s Final Record of Decision (Final ROD), capping eight years of environmental review under the National Environmental Policy Act (NEPA).
- 01 Stibnite Gold Project FEIS – Abstract to Chapter 2 Alternatives
- 02 Stibnite Gold Project FEIS – Chapter 3 Affected Environment
- 03 Stibnite Gold Project Final EIS, Chapter 3, Pt 2, Affected Environment
- 04 Stibnite Gold Project FEIS – Chapter 4 Environmental Consequences
- 05 Stibnite Gold Project FEIS – Chapter 5 to Appendix A
- 06 Stibnite Gold Project FEIS – Appendix B Response to Comments
- Federal Register Notice of Availability
- Stibnite Gold Project Final EIS Errata
- Wildlife and Wildlife Habitat Specialist Report
- Vegetation: General Vegetation Communities, Botanical Resources, and Non-Native
- Recreation Specialist Report
- Wetlands and Riparian Resources Specialist Report
- Water Quantity Specialist Report
- Water Quality Specialist Report
- Soils and Reclamation Cover Materials Specialist Report
- Special Designations Specialist Report
- Air Quality Specialist Report
- Fisheries and Aquatic Habitat Specialist Report
- 2021 Modified Mine Plan Alternatives Report
- Social and Economic Conditions Specialist Report
- Noise Specialist Report
- Climate Change Specialist Report
- Access and Transportation Specialist Report
- Heritage Resources Specialist Report
- Tribal Rights and Interests Specialist Report
- Scenic Resources Specialist Report
- Executive Summary
- Chapter 1: Purpose and Need
- Chapter 2: Alternatives
- Chapter 3: Affected Environment
- Chapter 4: Environmental Consequences
- Appendix A: Forest Plans
- Appendix B: 404(b)(1) Analysis Framework
- Appendix C: Detailed Affected Area Tables
- Appendix D, Part 1: Preliminary and Proposed Mitigation Measures
- Appendix D, Part 2: Conceptual Stream and Restoration Plan 1
- Appendix D, Part 3: Conceptual Stream and Restoration Plan 2
- Appendix E: Geologic Resources and Geotechnical Hazards
- Appendix F: Air Quality and Climate Change
- Appendix G: Soils and Reclamation Cover Materials
- Appendix H: Vegetation
- Appendix H: Special Status Plant Species Mapbooks (Alternatives 1-4) Part 1
- Appendix H: Alternatives 1-4 Part 2
- Appendix H: Landfire Vegetation Communities and Whitebark Pine Impacts
- Appendix I: Wetlands and Riparian Resources
- Appendix J: Fish Resources and Fish Habitat
- Appendix K: Wildlife and Wildlife Habitat
- Appendix L: Cultural Resources Previous Survey Mapbooks
- Appendix M: Public Health and Safety
- Appendix N: Recreation
- Appendix O: Scenic Resources
- Stibnite Gold Mitigation Plan
- Fisheries and Aquatic Resources Mitigation Plan
- Fishway Operations and Management Plan
- Final Wildlife Habitat Mitigation Plan
- Reclamation and Closure
- Stream Functionality Assessment and Stream Design Part 1
- Water Quality Management Plan
- Stream Design Part 3
- Stream Design Part 5
- Stream Functionality Assessment Report
- Stream Functionality Element Justification TM
- Access to Site
- Access & Transportation: Change in Traffic Volume
- Access & Transportation: Mine Traffic
- Access & Transportation: Public Lands
- Alternative 2
- Aquatics
- Critical Minerals
- Employee Housing
- Economic & Social Gains
- Fish Passage
- Fish Resources & Habitat
- Hazardous Materials
- Lime-Kiln
- Roadless Area: Proposed Facilities
- Roadless Area: Proposed Roads
- Scenic Resources
- Surface Mining
- Surface Water and Groundwater Quality
- Surface Water and Groundwater Quantity
- Tailings Storage Facility
- Vegetation
- Water Quality
- Water Quality History & The Clean Water Act
- Wetland and Riparian Areas
- Wildlife
- Worker Site Safety
- Our Plan: Executive Summary
- Our Plan: Ch 1 Introduction
- Our Plan: Ch 2 Midas Gold’s Core Values
- Our Plan: Ch 3 Socioeconomics and Workforce Requirements
- Our Plan: Ch 4 Past Mining and Mining Related Legacy Issues
- Our Plan: Ch 5 Restoration and Mitigation
- Our Plan: Ch 6 Environmental Protection
- Our Plan: Ch 7 Operations: Offsite Infrastructure
- Our Plan: Ch 8 Operations: Site Preparation and Onsite Infrastructure
- Our Plan: Ch 9 Operations: Surface Mining
- Our Plan: Ch 10 Operations: Ore Processing
- Our Plan: Ch 11 Operations: Thickened Tailings Management
- Our Plan: Ch 12 Operations: Project Logistics and Materials Handling
- Our Plan: Ch 13 Operations: Exploration
- Our Plan: Ch 14 Restoration, Closure and Reclamation
- Our Plan: Ch 15 Monitoring
- Our Plan: Acronyms, Glossary and Scientific Terminology